Laserfiche WebLink
SECTION fI. -REVISIONS TO THE PERMIT <br />The following is a summary of the revisions to the permit that have occurred since the Permit <br />Renewal No. 2/Permit Revision No. 3 Findings Document dated February 5, 1993. <br />TECHNICAL REVISIONS <br /> Bond <br />No. Subiect Decision and Date Adjustment <br /> <br />63 1992 Annual Report Approved 7/13/93 None <br />64 1993 Annual Report Approved 5/09/94 None <br />65 Sage #1 and #2 Ponds and Approved 7/15/94 None <br /> Modification of Spillways <br />66 1994 Annual Report Pending <br />67 Oak No. 1 and No. 2 Ponds Approved 8/30/95 +$ 3,313.00 <br />68 Seven Deep Development Drill Holes Approved 7/05/95 +$26,940.00 <br />69 Scraper Pit Slide Remediation Pending <br />MINOR REVISIONS <br /> Bond <br />No. Subiect Decision and Date Adjustment <br />122 East Pyeatt Diversion No. 3 Approved 3/11/93 None <br />123 Include Flow in Sampling List A-3 Approved 4/14/93 None <br />124 D Pit Haul Road Realignment Approved 7/29/93 None <br />125 A Pit Topsoil Exclusion Update Approved 8/16/93 None <br />126 A Pit Mining Sequence Change and Approved 8/16/93 +$ 2,014.00 <br /> East Pyeatt Diversion No. 3 <br />127 Remove Municipal Landfill Designation Approved 9/01/93 None <br />128 Additional 3.3 Acre Topsoil Stripping Approved 10/01/93 +$ 8,562.00 <br /> in West Buzzard <br />129 Additional 10.3 Acre Disturbance in Approved 1/27/94 None <br /> H Pit <br />130 Light Use and Access Road Map Approved 5/12/94 +$13,716.00 <br />131 1994 A Pit Topsoil Stripping Exclusion Approved 7/15/94 None <br />132 A Pit Haul Road Realignment Approved 8/24/94 None <br />133 Revised Access Road Locations and Approved 12/16/94 None <br /> Revised Culvert Sizing <br />134 Additional A Pit Disturbance Approved 4/24/95 +$43,980.00 <br />135 Culvert, Ditch and Haul Road Approved 5/01/95 None <br /> Information Update <br />136 Temporary Drainage into Sage Approved 6/02/95 None <br />2 <br />