Laserfiche WebLink
We will notify you of the acceptability of the bond rider upon receipt and review in <br />Denver. <br />16. This item requested an amended Map Exhibit 1 IC, to correct apparent errors. The <br />amended map was submitted. Issue Resolved. <br />17 and 18. These items requested certain information regarding the ability of the portal seals <br />and discharge pipes to safely accomodate the post-sealing minewater discharge <br />flow in perpetuity. Information submitted adequately addressed engineering <br />aspects of the sealing, but information on hydrologic aspects (i.e. quantity <br />and rate of inflows and discharge) is lacking. This information is necessary <br />to verify that the engineered sealing plan and discharge pipes will be <br />adequate. <br />