Laserfiche WebLink
<br /> <br />June 8, 1990 <br />Page 7 <br />Fertilizer $5.00/50#: 6.8 ac @ 100#/ac <br /> <br />68.00 <br />Change acreage to 3.5 acres, yielding $35.00. <br />Seedbed prep 5.5 ac @ $43.00/ac <br /> <br />.00 <br />Typographical error on acreage. No comment. <br />Seed and fertilizer application <br />6.8 ac @ $48/ac <br />Change acreage to 3.5 acres, yielding $168.00 <br />Straw mulch 6.8 ac @ $33/ac <br />Change acreage to 3.5 acres, yielding $210.00 <br />Crimp Mulch 6.8 ac @ $33/ac <br />Change acreage to 3.5 acres, yielding $115.50 <br />$ 326.40 <br />$ 816.00 <br />$ 224.40 <br />As the result, the MLRD DIRECT COST SUBTOTAL should be educed to <br />$22,348.44. RRI has no comment_ on the MLRD MOB/DEMOB costs. A <br />recalculation of the indirect costs @ 15.8 yields $3, 22.60 for <br />total first year bond o~ $26,071., <br />_~- <br />/" <br />Mr. Renner's comments one, two and three are <br />attached report. <br />RRI Chances in Permit Houadartr and Acreage <br />Zn the original amendment RRI proposed a permit area of <br />As the result of the controversy over "permitted area" <br />actual acreage depicted on Plate 4, RRI has carefully re <br />its mine plan. <br />in the <br />200 acres. <br />versus the <br />-evaluated <br />In both the amendment and the technical revision, RRI noted two <br />instances where a technical revision ("TR") may be required. <br />First, a TR would be required if RRI seeks to use th disturbed <br />area at the back of the site beneath the cliffs for r clamation. <br />