My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97773
DRMS
>
Back File Migration
>
Revision
>
REV97773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:02 AM
Creation date
11/22/2007 12:12:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Revision
Doc Date
11/15/2005
Doc Name
Bond Release Application
From
Hydro-Environmental Solutions Inc
To
DMG
Type & Sequence
SL4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 2005 Hayden Gulch Mine * Frnal Band Release Application Page 2 <br />includes a small reclaimed surface slump feature Located at the former mine pit highwall. <br />Stabilization measures at the slump were completed in accordance with Minor Revision No. 07 <br />(MR-07) and MR-13 during 1994 and 1998, respectively. <br />The result of the shrub augmentation and slump stabilization activities was that the period of <br />liability was extended for these four areas and because they did not meet the minimum period of <br />liability under Rule 3.023, the four pazcels were excluded from SL-03. <br />Section 2, General Requirements of a Bond Release Application, addresses the general <br />application requirements for alt bond release applications. Section 3, Requirements of Phase II <br />Bo»d Release and Section 4, Requirements of Phase III Bond Release, address the specific <br />information required in the release application for Phase II and Phase III, respectively. <br />2.0 GENERAL REQUIREMENTS OF A BOND RELEASE APPLICATION <br />The following information is provided in accordance with Rule 3.03.2 of the Regulations as <br />outlined in the Bond Release Guideline: <br />1. Date ofRequest.• <br />' • November 4, 2005 <br />2. Permittee: <br />' • Hayden Gulch Terminal, Inc. <br />701 Market Sffeet, Suite 700 <br />St. Louis, MO 63101 <br />(303) 342-3400 <br />3. PermitNum6er: <br />' • C-80-003 <br />4. Date Permit was Approved: <br />' • January 4, 2002 (Renewal) <br />5. Mine Name: <br />' • Hayden Gulch Mine <br />' 6. Phase of Bond Release Requested.' <br />• Final Phase II/Phase III <br />' 7. Number of Acres: <br />• Final Phase II - 8.9 acres <br />• Final Phase III - 8.9 acres <br />' 8. Bond Company: <br />• Travelers Casualty and Surety Company of America <br />
The URL can be used to link to this page
Your browser does not support the video tag.