Laserfiche WebLink
19. The Division is anticipating a letter from the Bureau of Land Management concerning <br />this revision. The letter will be forwarded to BRL as soon as the Division receives it. <br />The Division has no further concerns. Enclosed is a memo frotn BLM to OSM, dated <br />August 3, 2001 concerning PR-O5. In that memo, BLM consents to the activities <br />proposed in PR-O5. Bowie Resources was copied in that memo. <br />20. BRL's original submittal contained a request for one de-gas drill hole and the associated <br />disturbance. The reclamation bond estimate that BRL submitted for the one de-gas hole <br />was acceptable to the Division. In the adequacy response letter dated August 23, 2001, <br />BRL proposed an additional de-gas drill hole and associated disturbance. The updated <br />reclamation bond estimate submitted by BRL for the two de-gus holes was reviewed by <br />the Division. The Division's estimate is $125.00 more than BRL's estimate. Attached are <br />the Division's reclamation bond e.stirnate worksheets. Please advise the Division if the <br />Division's estimate is acceptable to BRL. <br />The Division has no further concerns. In a letter dated September 25, 2001, the operator <br />stated that the Division's reclamation liability estimate is acceptable. <br />If you have any questions, please call me. <br />Sincerely, <br />]o eph . Du~h <br />Environmental Protection Specialist <br />Attachment <br />cc: Jim Stover P.E. (J.E. Stover & Associates) with attachment <br />Lynn Lewis (Bureau of Land Management) without attachment <br />Cazl Johnston (Office of Surface Mining) without attachment <br />Sandy Brown (DMG) without attachment <br />c: \m s97\bowie2\pr5 adeg4 <br />