Laserfiche WebLink
• _ • 11111111111 ityly <br /> ALBERT FRET i SONS, INC. GENERAL OFFICES AMP PLANT <br /> SAND AND GRAVEL 11521 BRIGHTON ROAD • HENDERSON,COLORADO 80640 <br /> 1303)2W3318 <br /> AS <br /> July 22, 1996 <br /> Ms. Christina Kamnikar <br /> Reclamation Specialist q� _ <br /> Division of Minerals and Geology ! rFIV�D <br /> 1313 Sherman St., Room #215 23 1996 <br /> Denver, CO 80203 Division <br /> Of M�nE,e,�a vouiuy� <br /> Dear Christina; <br /> RE: Technical Revision <br /> Bromley Pit (Frei Pit #3) <br /> M.L.R.B. Permit # M-79-165 <br /> This Technical Revision is submitted to address the lake of adequate topsoil needed on <br /> the site for resoiling purposes. Please refer to the map exhibit attached for the location of <br /> the area discussed in the following text. The inspection report dated April 3, 1996 outlined <br /> the amount of topsoil on the site at that time and supplied an estimated amount we needed to <br /> make up so there would be a minimum of 12 inches of topsoil on the reclaimed area. The <br /> inspection report called for obtaining or increasing the bond to allow for purchasing 17, 883 <br /> cy of topsoil. We have resoiled 1.70 acres ± on the northern side of the site with the <br /> required 12" of topsoil. The following table accounts for the remaining topsoil needed to <br /> resoil the site. <br /> AREA AC. CY <br /> TOTAL AREA 13.0 20,973 <br /> EXISTING PILES -3,090 <br /> NORTH AREA 1.7 -2,743 <br /> REMAINING 11.3 15,140 <br /> As you know we operate 2 other mining sites in the immediate area of this site. All <br /> three share the same access road off Colorado Blvd. The Miller pit (M-81-096) is being <br /> mined at this time and there is an excess of topsoil on the site. The most recent analysis <br /> indicated there is 66,700 cy stored on that site. As of this date we have to retain 23,275 cy <br /> for the Miller Pit, and 23,667 cy for the Fernald Pit (M-77-011). This leaves 19,758 cy of <br />