Laserfiche WebLink
Section 780.18(b) Continued Revised June 13, 1984 <br />previously approved, but with significantly altered over- <br />burden volumes and handling plans. <br />All costs associated with the total reclamation of the <br />mine in its current state are summarized as follows: <br />Summary of Total Reclamation Costs <br />Backfilling S 3,534,200 <br />Smooth Grading 11,100 <br />Topsoil Replacement 88,900 <br />Re vegetation 131,100 <br />Road and Surface Facility Area <br />Reclamation* 45,600 <br />•q Sedimentation Pond Reclamation 191,100 <br />Facility Removal Cost 50,200 <br />Rough Grading - Shop Area 3,400 <br />Topsoil Stockpile Area Revegetation 11,200 <br />Revegation Costs for Previously <br />Reclaimed Area 63,20 <br />TOTAL $ 4,066,800 <br />* Includes only costs of ripping roads and hauling road <br />surfacing material (1 foot), Other road reclamation costs <br />are already included within other categories. <br />Detailed supporting calculations for all costs shown <br />above are presented in Exhibit 58. <br />•i <br />~1 <br />780-63 d <br />