Laserfiche WebLink
EXHIBIT L <br />V. Area C - Haul °aad # 1 C2.7 <br />' Acres) • <br />Tasks Cost <br />Construct water bars- <br />1 966 loader for 1 day X70 X 6 - 5560 <br />1 laborer for 1 day 7.50 X 8 - 60 <br />Revegetaticn- <br />1 pickup truck Eor 2 days $6 X 16 - 96 <br />1 supervisor for 2 days 12 X 16 192 <br />2 laborers for 2 days 7.50 X 32 ~ 2'10 <br />Materials- <br />20 lbs of grass seed 20 X 10 200 <br />200 seedlings 200 X 1 200 <br /> <br /> Total $1 .5'38 <br />VI. Area D - Access Roads (.7 Acre) <br />Tasks <br />Gonstruct water bars- <br />1 966 loader for 1/2 day <br />1 laborer Eor 1 day <br />Revegetatian- <br />1 pickup truck for 1 day <br />1 supervisor Eor 1 day <br />3 laborers Eor 1 day <br />Materials- <br />10 lbs grass seed <br />100 shrub seedlings <br />Cost <br />$70 X 't ~ 5260 <br />7.50 X 6 ~ 60 <br />6 X B '3B <br />12 X 6 9fi <br />7.50 X 2'3 - 180 <br />30 X 10 m 100 <br />100 X 1 100 <br />Total 5664 <br />VII. Crusher Fines Washout (. 5) <br />Labor <br />2 men/10 hrs./3 days <br />E i ment rental <br />Koto-tiller = 48 per day/ <br />3 days <br />Bead <br />15 lb./ac./Seed mix per <br />reclamation plan <br />(*-Thurber's fescue, which is <br />not available according to <br />local seed outlet) <br />Mulch <br />20 bales hay/2.50 per bale <br />Total: <br />Total Indirect Coate <br />Plus 10+6 Indirect Coate <br />Total Reclamation Coeta <br />Revised <br />Amendment #2 <br />6/92 <br />3 <br />980.00 <br />149.00 <br />66.09 <br />50.00 <br />$740.00 <br />12,752.00 <br />1,275.20 <br />$14,027.20 <br />