Laserfiche WebLink
• EXHIBIT E • <br />impact. <br />During the Four or Five seasons <br />being accomplished, the results will <br />will he altered iF not successful. <br />i RECLAMATION PLAN <br />that the reclamation plan is <br />be monitored and procedures <br />Success of the reclamation program will ba assured when the <br />reclaimed areas provide as good winter range for deer and elk as <br />the immediate surrounding area, and the adverse scenic impact of <br />the mining operation is minimized by the revegatation program. <br />VIII Raolamatioa of Crasher Fiaea Tlaahout <br />During the fall of 1992, reclamation work will be done on an area of <br />the dry wash below the lower bench into which crusher fines washed <br />during spring snowmelt. The fines in the drainage channel will be <br />roto-tilled, amended with peat moss or dry manure, then re-seeded and <br />mulched. Work will be completed by November 2, 1992. <br />Revised <br />6/92 <br />5 <br />