Laserfiche WebLink
<br />r <br />Road fill heights and slopes are depicted on the <br />road cross sections included in Attachment 3. <br />Locations and sizes of the underpass and <br />culverts are also shown. <br />The reclamation costs have been calculated to be <br />$438,820 which would include removal of roads, <br />fills, culverts and bridges, as well as <br />topsoiling, seeding, fertilizing, etc. However, <br />even with this added cost, our current bond of <br />$3.8 million exceeds the amount needed to cover <br />total disturbance through the current bonding <br />period. <br />Also find attached a copy of the Garfield County permit approving <br />this access road (Attachment 4), a set of updated maps depicting <br />the new, reduced permit area agreed to by Union Oil Company <br />(Attachment 5) and a summary of publication activities relative <br />to this amendment (Attachment 6). If you require additional data <br />or have questions, please contact me at 695-2203 or at the above <br />address. <br />Very truly yours, <br />A. C. Bishard <br />ACB:njm <br />Enclosures <br />