My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97383
DRMS
>
Back File Migration
>
Revision
>
REV97383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:45 AM
Creation date
11/22/2007 12:08:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
3/3/1982
Doc Name
MORRISON QUARRY SECOND AMENDMENT FN 73-21
From
MLRD
To
GILBERT F RINDAHL
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ • <br /> <br />F'r. Gilbert Rindahl -2- March 3, 1982 <br />?. The staff considers the disturbance of the unnamed gulches as a <br />disturbance of the surface water systems and a disturbance to the local <br />tLydrologic balance. Please state how the historical drainages will be <br />reestablished. <br />4. Please describe the post-mining internal drainage of the quarry. <br />'Che staff suggests that on each phase floor, a definite catch basin be <br />Formed. Hopefully, these catch basins will provide wildlife with water <br />3t both ends of the quarry. <br />5. How will the water diversion structures be reclaimed? <br />Exhibit G - [Dater Information <br />1. Nas the State Engineer been contacted reaardiny storage rights foz' <br />flood waters captured in the pit? <br />Exhibit L - Reclamation Costs <br />1. The staff feels that the reclamation costs approved For Amendment ItI <br />are more appropriate than the costs proposed in this application. The <br />staff suggests the following reclamation costs: <br />Surface Preparation <br />1. 1744 yd3 at $•60/yd3 ---------------- $ 806.00 <br />2. Obtain and spread organic material--- $ 500.00/Acre <br />3. Seeding ----------------------------- S 200.00/Acre <br />4. X' yd3 of fill @ $.60/ydl ----------- ~ <br />5. Maintenance and watering ------------ $2,000.00 (5 yrs.) <br />Total Reclamation Cost/Acre 53,506.00 plus k.~(4 <br />2. Please submit a total bond proposal for this amendment. <br />If you are unable to adequately address the above items, or cannot satisfy <br />the public notice requirements outlined in Rule 2.2 prior to the /'~l~ i c h ~,4L.~S <br />meeting of the Plined Land Reclamation Board, you may request a continuance <br />of the Board's consideration of this application. <br />If you have nay questions/comments, please do not hesitate to contact me. <br />Si11ncereJr~,y, <br />Jay Lucas <br />Reclamation Specialist <br />JL/mt <br />
The URL can be used to link to this page
Your browser does not support the video tag.