Laserfiche WebLink
.. _ , , iii iiiiuiuiiu iii <br />OF~~~O<O DEPARTMENT OF NATURAL RESOURCES <br />wry /~^,? p 9\\ <br />Q. e`.dJL~~~O~ D 1d a n;p P,iscno. Ereculme Onrclgr <br />~ MINED LAND RECLAMATION DIVISION <br />-.. <br />.+`~~, ; <br />~/rt DAVID C. SHELTON Director ~, <br />R¢nertl D Lamm <br />G~~~snor <br />Ffarch 3, 1982 <br />dfr. Gilbert 7'. Rindahl <br />2180 S. Ivanhoe Street <br />Denver, Colorado 80222 <br />Re: Morrison puarry - Second Amendment <br />Our File No. 73-21 <br />Dear P1r. Rindahl: <br />~• <br />I ha ve reviewed the above application for adequacy and have the following <br />comments and questions which are intended to aid you in bringing this <br />application into full compliance with the law and to the satisfaction of <br />the hfined Land Reclamation Board. Please address the following items in <br />detail as soon as possible. <br />I. The submitted application fee was calculated on the basis of a new <br />permit. The fee should have been calculated based on the Amendment <br />Fee structuz~e. The correct fee for 190 acres is $750.00. <br />Exhibit D - Ffinina Plan <br />1. Are the hlasting aspects (ma ximvm load/delay, delay times, schedule, <br />etc.) for this amendment the same as for the original permit? <br />2. Which drainage diversion alternative will be utilized? Please state <br />why and how the chosen alternative minimizes the disturbance to the hydro- <br />logic balance. <br />3. h'here will the overburden stockpiles be located? <br />4. Please detail the internal drainage and sediment control system for <br />each mining phase. <br />t E - Reclamation Plan <br />1. What is the source of the fill shocrn on the bench cross-section? <br />2. Wi11 this site be deeded over to Jefferson County as atr addition to <br />Falcon Park when mining is complete? <br /> <br />x123 Centenn;il f3u;lding. f3t3 Sherman Street Denver, Colorado 80203 Tel (s03) E66-3567 <br />