Laserfiche WebLink
<br />assumed that there will be insufficient topsoil to cover the reclaimed slopes so <br />that the surface of the slopes will essentially be rock. These reclaimed rock <br />surfaces will blend in with the undisturbed slopes adjacent to the harvesting <br />area. It is anticipated that a portion of the initial bench will be left as a road to <br />allow landowner and Holy Cross Electric access to the area and the power line <br />respectively. <br />The estimated acreage of the disturbed area on the Mining Map is 4.07 acres. <br />The reclamation liability is essentially the cost of reducing the highwall and <br />cleaning the site of any trash. <br />