My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97176
DRMS
>
Back File Migration
>
Revision
>
REV97176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:37 AM
Creation date
11/22/2007 12:06:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Revision
Doc Date
4/26/1997
Doc Name
MINING PERMIT COAL
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-6- <br />b. Utilizing any methods specified in the permit by the Division in approving <br />alternative methods of compliance with the Act and in accordance with the <br />provisions of 2.07.6(2)(m) and Rule 4. <br />5. The operator shall pay all reclamation fees required by 30 CFR, Chapter VII, <br />Subchapter R(1989), for coal produced under the permit for sale, transfer or use, <br />in the manner required by that Subchapter. <br />6. Within thirty days after a cessation order is issued under 5.03.2(1), for operations <br />conducted under the permit, except where a stay of the cessation order is granted <br />and remains in effect, the permittee shall either submit to the Division the <br />following information, current to the date the cessation order was issued, or notify <br />the Division in writing that there has been no change since the immediately <br />preceding submittal of such information: <br />a. Any new information needed to correct or update the information <br />previously submitted to the Division by the permittee under 2.03.4(3); or <br />b. If not previously submitted, the information required from a permit <br />applicant by 2.03.4(3). <br />7. If analyses of the mining and reclamation operation and the data collected <br />through monitoring and experimentation by the operator or monitoring by the <br />Division indicate in the judgment of the Division that the operation will not be <br />able to comply with the requirements of the Act and lawful rules and regulations <br />thereunder, operator hereby agrees to exercise its best efforts, after consulting <br />with the Division, to modify the plans prospectively to correct such deficiencies. <br />Such modifications may require technical revisions or amendments to the permit. <br />8. This permit may be revoked or suspended for non-compliance with the Act or <br />lawful rules or regulations promulgated by the Boazd. <br />9. No coal mining operations shall be conducted on Federal surface or coal until the <br />Secretary of the Interior has approved the mining plan. The Division reserves [he <br />right to modify the permit, when appropriate, in order to resolve conflicts <br />between the permit requirements and the requirements of other laws, rules and <br />regulations administered by the Secretary of the Interior. <br />10. a. Operator hereby bargains, sells and conveys unto the State of Colorado the <br />right to enter upon the lands above described and to accomplish thereon the <br />reclamation of such [ands as required by this permit and by applicable law. <br />b. Such right to enter shall be exercisable only if the Board or the Division <br />shall have lawfully determined: <br />i. that reclamation required by law to have been performed upon such <br />lands has not been performed, and that <br />
The URL can be used to link to this page
Your browser does not support the video tag.