Laserfiche WebLink
• <br /> <br />C~ <br />release of water monitoring responsibilities associated with the TDA as of December <br />31, 2006. This modification would end monitoring at M-4R, M-6, M-7R, M-8, M-9, <br />M-12, M-13R, M-14, M-15, L-1S, L-1D, L-2S, L-2D, L-3S, and L-3D. Table G.3-1 <br />lists the proposed water monitoring program that BMRI would implement through <br />final site closure. All references to pazameter lists in Table G.3-1 aze to applicable <br />tables in TR-32. Table G.3-2 lists all wells that aze scheduled to be abandoned. <br />Battle Mountain Resources, Inc. G-13 Telesm Solutions, Inc. <br />P:~Pmj¢ct 1212-Newmont(SanLUis)15mLUislPe~mi1 Ame~Mment - Weat Pil MavagementWeemuAmevamevt_v3.doc July 2~6 <br />