Laserfiche WebLink
t <br />• • <br />Truck Cyele Time <br />Exchange - 0.70 <br />Load - 1.900 <br />Maneuver 4 dump 1.20 <br />Travel Time Ihaul i return): <br />Road cond. descr.:Fi rm, smoc <br />Haul route <br />Road Length Grade <br />seg. p (ftl res.(!) <br />1 700 30.00 <br />Sheet 3 of 7 <br />min. Adj. for altitude - 0.70 min. <br />min. - 1.40 min. <br />min. 1.20 min. <br />th, rolling dirt/lc. surfaced road, main[a fined <br />Rolling Total Velocity Travel time <br />tes. (tl res. (k) Ifpm) (mint <br />3.00 33.00 237 3.01 <br />Haul time 7.01 min. <br />Return [oute ------ <br />1 700 -30.00 3.00 -2].00 105] 0.]3 <br /> <br />•1sc d last seg. adj. for accel. /decal. Aetu rn time D.13 min. <br /> focal Truck Cycle Time - 7.04 min. <br />Loadet Unic Prod.- 390.00 LCY/Hr - Adj. for effrc fancy- 323.]0 LCY/Hr <br />Truck Uni[ Piod.- 116.38 LCY/Hr - Adj. fot eff~crency- 96.60 LCY/Hr <br />Optimal number of tacks per loading unit ~1 <br /> - <br />-Selected number of [rucks per loading unit 1 <br />,~ 3 ~ y ~F <br />s <br />Ho <br />k Ceam <br />d <br />ce ion <br />l <br />[ ----- <br />60 LCY/Hr <br />96 <br />, pro <br />ur <br />y <br />ruc <br />u . <br />Nec Hourly ixuck/Loader Team Production 96.60 LCY/Hr <br />Ne[ Hourly Multiple T/L Team Production 96.60 LCY/Hr <br />JOB COST: <br />• - ••••Fleet size 1 T/L Team (sl <br />Unit CosC 51.131 /LCY <br />Total Job lime: 1]2.86 Hours <br />~~ <br />Total Job Cosc: 918, BB9 <br />~~ ~i~ <br />~~ <br />