Laserfiche WebLink
.t • <br />HOURLY PRODUCTION: <br />Job Condit ion Correct ions <br />Al[. 7,400 ft. <br />Alt. adjustment ....... .... <br />Job efficiency ... (lah/dl <br />Nec Corrections <br />Load Equipment Capacity <br /> <br />Sheet ] of <br />Truck/Load Tearo Support Equipment <br />IYUtk Loader Load Area Dump Area <br />1.000 1.000 N/A N/A <br />O.B30 0.830 N/A N/A <br />O.B30 0.830 N/A N/A <br />Rated capacity 3.500 LCY (nominal heaped) <br />-"-~"""- Fill material description: <br />Bucket Cill factor 0.975 Loose material - mixed moist aggregates <br />Adjusted capacity 3.913 LCY <br />Truck Capacity <br />Neigh[ Basis; <br />Material weigh[ 2,300 lbs/LCY <br />Mac. description ~~"'---- <br />GENERAL FILL <br />Rated payload - 93,000 lbs <br />Payload volume - SB.70 LCY <br />Volume Basis: <br />Struck capacity 12. 00 <br />Heaped capacity - 18. 00 <br /> Average - 15. 00 LCY <br />Max. Avg. Volume • 15.00 LCY <br />Adj. truck volume based on discreet no. of loader passes 13.65 LCY <br />Load Equipment Cycle Time <br />Number of discreet loader passes required co fill crock 4 <br />ira ck loaders- '----" <br />Load mace rial description: N/A <br />Excavators/Shovels - cycle time vs. job cond is ion rating: N/A <br />- selected value within basic racing N/A <br />Track loaders - basic cycle time elements: Load time - N/A min. <br />Maneuver time - N/A <br />Dump time - O.OB <br />Unadj used Basic Cycle time 0.500 min. <br />wheel/Track loaders- -~----- <br />Cycle Time Factors: Description Factor Imin.l <br />Material -Mixed material 0.020 <br />Pile condition -Conveyor or dozer piled 10'h and up 0.000 <br />Truck Ownership -COamlOn ownership of trucks 6 loaders -0.090 <br />Operac ion -Constant operation -0.040 <br />Target -Nominal target 0.000 <br />Net cycle time adj. -0.060 min. <br />Adjusted Basic Cycle Time - 0.490 min. <br />Total load time per crvck incl. exchange time adj.• 1.400 min. <br />•(bulk of 1st pass completed during truck exchange) ------- <br />