Laserfiche WebLink
.~• <br />• ! <br />ROADABLE EQUIPMENT: <br />_______________ <br />Total Eqp. Flee[ Sire Haul trip Aeturn trip <br />Machine Des<rlpt ion Cost/hr Ino. hauled) Cost/hr Cost/hr <br />sheet 3 0[ 3 <br />..........~~..~e.......~~~v.......~..........~._~_~~~~ ................................................. <br />Suhto[als 50.00 50.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: ""-'--- ----°--- <br />---------------'---------- weigh[ Omership Haul Rig Fleet Size Haul Trip Return Trip DOi Pecmic <br />Non-Roadable Eqp. Description (tons) Cost/hr Cosc/hc ono. hauled) Cost/hr Cos[/hr Cost/ea <br />..~~~...e ..................e.......~...............~.__~~~...._......................~~e~~~~~~e~~~e........~......~. <br />.............................................~..~~~.... ~....-.........~~~.~.. <br />Su b[ota is .....~~.e~~~ <br />50.00 <br />_________ ~~~~~~..~.._. <br />50.00 <br />_________ <br />Total Eqp. Fleet Size Haul Trip Return Trap <br />Roadable Eqp. Description Cosc/hr Ino. hauled) Cost/hr Cosc/hr <br />.~.......eve.....~...~~..........~.e~e~~~~.........~~~~~~.~ ..............~..........~.~~..~.~~~~......~ <br />Subtotals 50.00 50.00 <br />_________ _________ <br />EOllIPMENT HAUL DISTANCE E TIME <br />..~~e~~......~~~ .............. <br />Nearest major city or town within project area region: Canyon City <br />Total one way travel distance 30.0 miles . Average travel speed - 40.00 mph. <br />Job Time - Non Roadable Equip.• 1.00 hours load Roadable Equip.• N/A hours load <br />0.75 hours haul 0.]B hours haul <br />1.00 hours unload N/A hours unload <br />0.'15 hours return 0.05 hours return <br />JOB COST <br />Total Mob/Demob Cos[ S1,a75.10 <br />50.00 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob cost[ based on ] round trips, each trip <br />cons isc ing of a one-way loaded haul and a one-way empty return. Roadable equipment Ino haul rig raga iredl <br />Costa based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />sped Efed road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additions lly, pilot cats (one or two per rig depending on degree of oversize) are also required for oversize <br />equ ipmenc hauling, and loading/unloading time[ must be increased subscant Tally for equipment rhieh must be <br />partially dismantled for transport and re-assembled ac the job Bite. Costs Cor lif [ing equipment and ocher <br />support equipment needed [or Chis work should be included in the mob/demob costs. <br />