Laserfiche WebLink
<br /> <br />Colorado Divie ion of Ninerale and Geology sheet 1 of 2 <br />_________________________________________ <br />E$TIMATINC FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task p... 6 Prep. by <br />____________ JD FSlename..M043-6 <br />________ __________ <br />Date..... 23-JUn-97 Permit p M-BS-093 Mine......Red Canyon Quarry <br />Perini[ Action........ Phased Reclamation <br />_______________________________________________________ <br />___________ <br />_________________ <br />___________ <br />Task Description..... Mob/demob Equipment <br />_______________________________________________________ <br />___________ <br />_________________ <br />___________ <br />HOURLY EQUIPMENT COST <br />---_---••••••----_--• NOTE - This is a list to select from, not a li st of manda tory items co inc lude. <br />Mob/Demob Eqp. -Tractor 6x9, ]5,000 lb GVN, 3]5 HP, diesel pove red <br />-Lt. Trailer 25 [on [olding gooseneck, drop deck <br />-Med. Ira filer 50 [on folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 170 hp, 1/2 con racing, gasoline powered <br />-Hyd. Crane Gtove Ri58D rough terrain hydraulic crane, 20 Con capacity. 125 hp, 60 ft. boom <br />-Fuel Truck 6x9, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Fla cbed Truck: 20,000 16 GVN, 175 HP, diesel powered <br />Iasc Updace: ______________________________________________ ___________ _________________ ___________ <br />December, 1994 <br />" " " "-----" Lt. Aig Med. Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: c-25 T. 26-50 T. a 50 T. Car Crane Truck Truck Truck <br />.._. <br />... <br />».~.~............~ ............ <br />Ovnera hip Cosc/hr • 52].88 .....a~a~~~............~~~_~........~......... <br />531.23 $18.36 51.81 519.89 .._.~...... <br />56.45 ....~............ <br />512.]9 . <br />... <br />S5. ]1 <br />Operating Cost/hr • 526.89 529.29 534.2] 55.]2 $23.90 $18.93 $24.52 $8.00 <br />Operator Cos[/hr - 521.40 522.03 522.03 $21.29 $20.86 521.29 $21.24 521.29 <br />Helper Cost/hr $20.60 521.24 $21.24 $0.00 $0.00 50.00 50.00 50.00 <br />Total 596.]2 <br />_______ 5103.]9 5115.90 $28.17 $69.15 <br />_______ _______ _______ _______ 546.]2 <br />_______ 558.55 <br />_______ 534.95 <br />_______ <br />NON-ROADABLE EQUI PINT: <br />--"--" ""-'-"'---- Neighc Ovne rsh ip Haul Rig Fleet Size Haul Trip 'Return Trip DOT Permit <br />Machine Description (tons) Cosc/hr Cost/hr ono. hauled) [ost/hr Cosc/hr Cosc/ea <br />Cat DBN 36.00 590.32 5103.]9 1 5144.11 5103.79 <br />Loader i seeding equipment 29.00 538.14 596.]2 1 5134.86 $96.72 <br />Subtotals 5278.97 $200.51 50.00 <br />_________ _________ _________ <br />