Laserfiche WebLink
Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOB ILI2ATION / DEMOBI LI2ATION <br />_________________________________________________________ <br />_________________________________________________________ <br />Task p... 004 Prep. by LLK Fi lename..M410-004 <br />Date..... 29-Sep-99 Permit U M-77-410 Mine......Lross Mine <br />Permit Action........ Financial warranty update <br />Task Description..... Mob/demob equipment <br />HOURLY EOUI PMENT COST <br />Mob/Demob Eqp. -Tractor <br />-Lt. Trailer <br />-Med. Trailer <br />-HVy. Trailer <br />-Pilot Car <br />-H yd. Crane <br />-Fuel Truck <br />-Cube Truck <br />-Flatbed Truck <br />Last Update: <br />August, 1997 (trucks) <br />NOTE - this is a list to select from, not a list of mandatory item': to include. <br />6x4, 75,000 lb GVW, 375 HP, diesel powered <br />25 ton folding gooseneck, drop deck <br />50 ton folding gooseneck, drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 f[. boom <br />6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />bx4, 2,500 gallon capacity, 210 HP, diesel powered <br />30,000 lb GVW, 210 HP, diesel pace red <br />------------- -------- Lt. Rig Med.R i9 Nvy .R ig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck truck Truck <br />___________P <br />Ounershi ________ <br />Cost/hr ______ <br />- 825 ____ <br />.59 __________ <br />828.10 _____ <br />831 _____ <br />.38 ___________ <br />81.73 _______________ <br />824. 12 _______________ <br />86.88 _____________ <br />812.66 ___________ <br />87.88 <br />Operating Lost/hr = 528 .38 830.17 832 .34 84.82 831.48 819.57 Ee 5.56 811.82 <br />Operator Cost/hr = 822 .61 822.61 522 .61 821.82 823.13 822.35 Ee 1.24 822.35 <br />Helper Cost/hr = 821 .82 821.82 821 .82 80.00 80.00 80.00 90.00 80.00 <br /> Total = 898 .40 8102.70 8108. 15 828.37 878.73 548.80 859.46 842.05 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Weight Oune rship Haul Rig Fleet Size Haul Trip Returr Trip DO7 Permit <br />Machine Oescri pti on (tons) Cos[/hr Cost/hr (no. hauled) Lost/hr Cos[/hr Cost/ea <br />___________ <br />________________________________________ <br />Cat D8N 40.00 ___________ <br />836.00 ____________ <br />8102.70 ___________________________ <br />1 8138.70 _______________ <br />8102.70 80.00 <br />Reveg. equipment 15.00 830.00 898.40 1 8128.40 898.40 80.00 <br />Subtotals 8267.10 8201.10 80.00 <br />