Laserfiche WebLink
<br />3.1.3 Time Limit and Phased Reclamation <br />The operator will carry reclamation to completion with all reasonable diligence <br />operations. This is not a phased operation. Reclamation will follow minin <br />operationally feasible. This is a low volume pit except for times when more mate <br />for CDOT projects in this area. <br />3.1.4 Public Use <br />The operator does not plan on opening this area to public use. Public use would <br />around the equipment involved in this type operation. <br />3.1.5 Reclamation Measure -Material Handling <br />(1) Grading shall be carried on so as to create final topography appropriate <br />use selected as the Reclamation Plan. <br />(2) When back£Iling is part of the plan.... <br />consistent with <br />as closely as <br />al is demanded <br />undue risks <br />the final land <br />No backfilling is proposed for this operation. The backsloping on the pit perim ters will be an <br />integral part of the mining operation. Mining will proceed into the vertical pit fac (8' - 10') until <br />it has reached what will be the toe of the backslope. The balance of the mining ill be done at <br />2H:1 V as described eazlier. There are no known acid-forming or toxic materials own that could <br />be leached. <br />(3) All grading will be done in a manner to control erosion and siltation of the affected lands <br />to protect areas outside the affected lands from slides and other damage. If not eliminated, all <br />highwalls, if any, will be stabilized. <br />The design of the operation will prevent erosion and siltation of the affected lands There will be <br />no slide areas in this operation, and the only highwalls will be the 8' - 10' pit face which will be <br />eliminated in reclamation. <br />(4) All backfilling and grading shall be completed as soon as feasible after the ~ining process. <br />The applicant shall establish a reasonable timetable consistent with good minin practices and <br />reclamation procedures. <br />As stated eazlier, there will be no backfilling. Grading will be performed as reasonably consistent <br />with mining, stockpiling and equipment movement. Reclamation will follow mint gas closely as <br />operationally feasible. <br />(5) There are no refuse, acid-forming or toxic materials that will be mined or handled on site that <br />could cause unsightliness or affect the drainage system. <br />