My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96956
DRMS
>
Back File Migration
>
Revision
>
REV96956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:28 AM
Creation date
11/22/2007 12:04:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Name
EXHIBIT 58 REVISED JUNE 13 1984
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised June 13, 1984 <br />Overburden Stockpile Area: <br />Average haul distance <br />volume <br />= 1,000 ft. <br />= 18,800 cy* <br />+ 28,200 cy* <br />47,000 cy <br />From above, 657B scraper produces 485 cy/hr <br />To move 47,000 cy it will take 97 hours <br />657 cost/hr = $178.54; 5178.54 x 97 hours = $ 17,300 <br />*From Table 71 <br />Surface Facilities, Haul and Access Roads <br />Average haul distance = 5,000 ft. <br />volume = 23,200* <br />. 657B scraper can produce 216 cy/hr at 5,000' haul (60$ efficiency, <br />68 RR, 08 grade) <br />Actual production = <br />ideal x altitude adjustment equals 216 x .905 = 195 cy/hr <br />To move 23,200 cy it will take 119 hours. <br />657 scraper cost/hr = $178.54; 5178.54 x 119 hours = S 21,200 <br />TOTAL Topsoil Replacement Cost = $ 88,900 <br />*From Table 71 <br />TOTAL Revegetation Cost: <br />$827.00/acre x 158.50 acres = 5131,100 <br /> <br />lU <br />
The URL can be used to link to this page
Your browser does not support the video tag.