My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96956
DRMS
>
Back File Migration
>
Revision
>
REV96956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:28 AM
Creation date
11/22/2007 12:04:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Name
EXHIBIT 58 REVISED JUNE 13 1984
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised June 13, 1984 <br />Topsoil Replacement Cost <br />Existing Pit Area: Average haul distance <br />volume <br />= 2,000 ft. <br />= 17,600 cy* <br />+ 51,200 cy* <br />+ 29,500 cv* <br />98,300 cy <br />* From Table 71 <br />657B scraper can produce 408 cy/hr. at 2,000' haul (808 efficiency, <br />68 RR, 08 grade) <br />Actual production = <br />ideal x altitude adjustment = 408 x .905 = 369 cy. hr <br />To move 98,300 cy it will take 266 hours <br />657 cost/hr = 5178.54; $178.54 x 266 hours = 547,500 <br />•~ <br />Pit 1 Area: <br />average haul distance = 1,000 ft. <br />volume - [9.9 ac x 43560 ft3/ac ft x 0.5 ft] <br />c 27 BCY/ft3 = 7986 CY <br />657B scraper can produce 536 cy/hr at 1,000' haul (808 efficiency, <br />6B RR, 08 grade) <br />Actual production = <br />ideal x altitude adjustment equals 536 x .905 = 485 cy/hr <br />To move 7,986cy it will take 16 hours. <br />657 cost/hr. = 5178.54; 5178.54 x 16 hours = S 2,900 <br />i~ <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.