Laserfiche WebLink
RECLAMATION TIMETABLE <br />I• <br />• <br /> <br />Task <br />g Description Time Needed <br />months <br />1 Reclaim mining area east of existing Berry Pit (before final reclam) 0.5 <br />2 For Strips 2,3,4,5,6,7,8,9 move soil and overburden to reclaim previ- <br />ous strips. Ongoing reseeding and mulching of these strips. 120 <br />3 Mine out, regrade and resoil Strips 10, 11 and 12 (visual berm) 40 <br />4 Backfill overburden and soil in Strip 12 from stockpiles in old pit <br />area 0.25 <br />5 Move all portable equipment offsite 0.1 <br />6 Regrade pit area and stockpile area 0.5 <br />7 Retopsoil processing area and stockpile area. 0.25 <br />8 Regrade sediment pond 0.25 <br />9 Ripping or harrowing of any needed areas 0.25 <br />10 Reseed and mulch last 4 strips, processing area and stockpile area 0.2 <br /> <br /> Total Time 162.3 <br />4. Post-Reclamation Site Drainaee <br />The entire permit area will drain to the southwest after reclamation, as shown on Map F. This is the <br />original drainage direction toward the White River. <br />5. Weed Control <br />This area of Rio Blanco County is known [o have a weed of significant concern known as leafy <br />spurge as well as others such as the thistle group. United will take extreme care in preventing weeds <br />from establishing infestations in the permit area by doing the following: <br />Berry Pit 3/02 <br />17 <br />