My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-11_REVISION - M1977132 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977132
>
2002-04-11_REVISION - M1977132 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:58:23 PM
Creation date
11/22/2007 12:03:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977132
IBM Index Class Name
REVISION
Doc Date
4/11/2002
Doc Name
Revised pages and maps
From
Greg Lewicki and Assoc.
To
Rio Blanco County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The seed mix to restore dry rangeland to all reclaimed areas is given below: <br />I <br />Species Variety PLS/Acre Seeds/sq.ft <br />Western Wheatgrass Arriba 3.2 <br />Indian Ricegrass Nezpar 2.5 <br />Streambank Wheatgrass Siberian 2.2 <br />Russian Wildrye Vinal 2.0 <br />Beardless Wheatgrass Whitmar 2.4 <br />Big Sagebrush 1.0 <br />Totals 13.3 <br />The rates above are for drill seeding, which will be the method employed on all mild sloping areas. <br />If the drill cannot negotiate the 2.SH:1.OV slopes, broadcast seeding will be employed at double the <br />rates per acre shown above. Seed will be drilled and certified weed-free mulch will be applied at the <br />rate of 30001bs per acre, and will be crimped into the soil surface. Commercial starter fertilizer will <br />. be applied at the rate of 20 pounds available nitrogen. <br />Map F shows all the final contours and reclamation areas planned for the site. Map C-3 shows the <br />cross-sections of the reclaimed terrain in comparison with the original terrain. It is seen from this <br />map that the restored land is lower due to the gravel extraction but is more than adequate to achieve <br />the post-mining land use. <br />The landowners desire that the access road remain to maintain entry to the site from Highway 13. <br />Much of this access road is off the permit area. <br />3. Reclamation Timetable <br />Since mining of the new lease area is concurrent with reclamation, the timetable is somewhat tied to <br />the rate of mining in this area. Since actual sales are difficult to predict, the assumption will be made <br />that the operation will mine and sell 100,000 tons of total product per year, on an average, The time- <br />• table in the mining plan also reflects these rates. The expected reclamation timetable is given below: <br />Berry Pit 3/02 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.