My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96657
DRMS
>
Back File Migration
>
Revision
>
REV96657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:16 AM
Creation date
11/22/2007 12:01:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
1/14/2000
Doc Name
FOIDED CREEK MINE C-82-056 PERMIT RENEWAL NO 3 ADEQUACY RESPONSE REVIEW
From
DMG
To
TWENTYMILE COAL CO
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />u <br />C: U H B\C82056\R N 03\011400adq. doc <br />0'1/14/00 <br />there specific information in the currently approved permit that should be removed from the <br />permit as a result of these updates? If so, please submit the appropriate revised materials. <br />Pond G -This pond services a small disturbed area at the Foidel Creek mine and a much larger <br />area ojMine 1, permit # C-81-071. The original design information should be included wi[h a <br />detailed demonstration that the disturbed area and the watershed characteristics are substantially <br />less than the design assumptions. The EPP survey for Pond G is not cert fled. <br />Twentymile Coal Company submitted information for Pond G on January 10, 2000. This material <br />addresses the Division's concerns adequately. <br />Pond T -Information for Pond T could not be located in Exhibit 8. Design information and an <br />appropriate as-built cer[ fication is required to demonstrate compliance with Rule 2.O.i.3(-l) and <br />Rule 4.05.6. <br />Pond C -Design information and an appropriate as-built cert fication is required to demonstrate <br />compliance with Rule 2.05.3(-!) and Rule 4.0.6. <br />12/6/99 materials <br />Appazently Plate I from permit #C-81-071 reflects accurate design information for ponds C and <br />T. An as-built certification is required by Rule 4.05.6(10), based on Plate 1 for both of these <br />ponds. The certification should cleazly state that these ponds were constructed in accordance with <br />the Plate 1 design information. There is currently no cross-reference found on Plate 1 to indicate <br />that certifications already exist in the permit. If there are certifications for pond C and T based <br />upon the infoanation found in Plate I, the location in the permit of the certifications needs to be <br />included on Plate 1. Please remember if the design has been revised since the original <br />certification, the certification needs to be updated to reflect the pond has been constructed in <br />accordance with the revised design. This item remains partially unresolved. <br />Pond E (FCT) -The EPP survey was not cert fled. As the Fish Creek Tipple permit information <br />is organizationally separate from the Foidel Creek permit, discussion ojthe operation, <br />maintenance, and plans to remove the structure should be added to Volume VII ojthe permit to <br />demonstrate compliance with Rule 2.05.3. (4)(a)(ii)(D). The cert~cation ojthe repairs discussed <br />in the 12/16/96 certification should be submitted for this pond. <br />Previous TCC resaonse <br />Pond E (FCT) survey will be submitted under separate cover. <br />12/6/99. 1?120/99. and 1/10/00 materials: <br />No new information was provided regazding this question. It remains outstanding at this time. <br />63. This item is being addressed in TR-32. <br /> <br />64. This item is being addressed in TR-32. <br />
The URL can be used to link to this page
Your browser does not support the video tag.