Laserfiche WebLink
dates 1997 <br />MR-2 Cumulative bond <br />schedule Approved Nov. 1998 <br />Section III <br />Status of Stipulations <br />The stipulation history for the Lorencito Canyon mine was reviewed as part of <br />the mid-term review. <br />Stipulation No. 1 <br />AS SHOWN ON MINE PLAN MAP 2.05.3-1, FOR SEDIMENTATION PONDS 001, <br />002, 003, 005, 007, 008 AND 009, LORENCITO COAL COMPANY SHALL <br />CONDUCT CULTURAL RESOURCES SURVEYS, SUBMIT THE SURVEYS TO <br />THE DIVISION, AND RECEIVE SHPO CLEARANCE PRIOR TO DISTURBING <br />AREAS ASSOCIATED WITH POND CONSTRUCTION. <br />Technical Revision No. 1 (TR-O1) provided responses for stipulation no. 1, 2, 3, <br />5, and 9 that were issued with the original permit approval. Cultural <br />resource surveys were completed for incorporation into Exhibit 5 of the permit, <br />and submitted to the State Historic Preservation Office (SHPO) for clearance. <br />In a letter dated October 2, 1997 from the SHPO to the Division, clearance was <br />given for the P-3 portal power line, the loadout power line, sedimentation ponds <br />001, 002, 003, 005, 007, 008, and 009, fill areas 2, 3, 5, and 8, and the Jeff <br />Place. This stipulation was complied with on November 10, 1997. <br />Stipulation No. 2 <br />AS SHOWN ON MINE PLAN MAP 2.05.3-1, FOR THOSE AREAS OF FILLS 2, 3, <br />5, AND 8 NOT ALREADY SURVEYED, LORENCITO COAL COMPANY SHALL <br />CONDUCT CULTURAL RESOURCES SURVEYS, SUBMIT THE SURVEYS TO <br />THE DIVISION, AND RECEIVE SHPO CLEARANCE PRIOR TO DISTURBING <br />AREAS ASSOCIATED WITH FILL DISTURBANCE. <br />(see response to stipulation no. 1 above) This stipulation was complied with on <br />November 10, 1997. <br />Stipulation No. 3 <br />LORENCITO COAL COMPANY WILL NOT COMMENCE CONSTRUCTION <br />