My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96508
DRMS
>
Back File Migration
>
Revision
>
REV96508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:10 AM
Creation date
11/21/2007 11:59:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
5/16/2006
Doc Name
Preliminary Adequacy Review
From
DMG
To
J.E. Stover & Associates Inc
Type & Sequence
TR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please provide documentation that any necessary modifications have been <br />made. Also, please amend the Protection and Control section of the <br />Wildlife Plan, on page 4-31, to specify the transmission facility design <br />specifications implemented to comply with 4.18(4). <br />10. The permit boundary was amended as necessary to include Well GW-1, and <br />appropriate right of entry documentation was provided as requested. Item <br />Resolved. <br />11. Figure 2.2-3 Surface Water Control Systems was amended as requested to <br />depict the ditch routing of drainage from the small watershed that was <br />previously diverted by Culvert "F". Repair/replacement of the concrete lined <br />section of the ditch will be verified during field inspection. Item Resolved. <br />12. The version of Figure 2.2-2 Surface Facilities that we received was not <br />amended to delete Culvert "F", and to include Culvert "P", as requested and <br />as indicated in the response cover letter. Please provide an amended <br />version of the figure with the requested updates. <br />13. The requested paginated sediment pond certification was provided for <br />inclusion in Appendix "O". Item Resolved. <br />14. A properly paginated reclamation cost estimate was submitted as revised <br />Table 3.7-1, Reclamation Cost Estimate. We have determined that an <br />additional cost item needs to be included for power line reclamation (please <br />see Enclosure C). Please update the amended Table 3.7-1 to incorporate <br />the revised cost estimate pages, if you concur with the revised estimate. If <br />you believe adjustments to the DMG estimate are warranted, please <br />provide proper supporting documentation. Note that the liability <br />increase of $9,614.00 estimated by the Division would increase the <br />required bond amount by $9,495.00 (to $309,495.00). <br />15. The weed control plan was updated as requested. Item Resolved. <br />16. The production success standard nan•ative was updated as requested. Item <br />Resolved. <br />17. Narrative regarding statistical adequacy demonstration and tests of <br />revegetation success was updated and requested. Item Resolved. <br />18. The requested drill hole abandonment report was previously submitted under <br />separate cover and was deemed acceptable. Item Resolved. <br />19. We have several comments and requests regarding the updated Probable <br />Hydrologic Consequences (PHC) projections: <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.