Laserfiche WebLink
6. Please provide information on the depth and diameter of all groundwater monitoring <br />wells (even those abandoned, unless they have been released from liability) for both New <br />Horizon 1 and 2. <br />Please provide a description of all structures located at surface water monitoring sites <br />(flumes, gauges, etc.). <br />Table 2.05.3(3)-2 shows design information for all culverts west of 27.00 Road. Is there <br />such a table for all culverts east of 27.00 Road? Also, while this table shows the diameter <br />of all culverts, it does not include the length. Please revise the permit application to <br />include a list of all culverts on site, including the diameter and length of each culvert. <br />9. Is the HDPE pipe that diverts the West Lateral Ditch above ground? If it is below <br />ground, please indicate the depth below ground. <br />10. There aze a number of culverts listed in the permit text (A-1 - A-13) that do not appear to <br />be on any maps, and it is unclear on any map where all of the ditches aze located. Most <br />of the maps include a lot of unlabeled information, rendering surface water control <br />features difficult to decipher. In accordance with Rules 2.04.7 and 2.05.3, please provide <br />one map which depicts all culverts, ponds, and ditches on site; preferably this map should <br />be limited to surface water features and topography. <br />11. Attachment 2.05.3(3) 7 includes design input and location information for small area <br />exemptions (SAES). The SAE information is limited to a description of one SAE at <br />Topsoil Stockpile K; please provide design inputs and construction details for all of the <br />other SAEs. <br />12. Attachment 2.05.5(3)-7 also includes design input and location information for the <br />"traveling" ponds ahead of the advancing pit. The information provided does not include <br />sufficient detail to determine a reclamation cost. Please provide a design plan view and <br />an embankment cross section for each of the traveling ponds. <br />13. Map 2.05.4-1 shows postmine drainage channels in the Pond 007 drainage area. There <br />don't appeaz to be any postmine drainage channels proposed for the areas draining to <br />Ponds 008-014. Are there plans for channels in the reclaimed areas draining to Ponds <br />008-014? If so, please provide a map showing their locations, and design details for each <br />drainage channel. <br />14. It is not clear in the permit text and maps whether there remains any surface water control <br />structures (ponds, ditches, culverts, SAEs) in the New Horizon 1 (Rice Tract) area, so we <br />aze unable to estimate remaining reclamation costs. Please provide maps and text <br />describing sediment control measures in place at New Horizon 1. <br />I5. There is a table, labeled Attachment 2.05.3(3)-10-13 (also repeated and updated on pages <br />18 and 23), which details drill hole information for holes drilled since June 14, 2001. Are <br />New Horizon Mine -7- November 23, 2005 <br />