Laserfiche WebLink
North Thompson Creek Mine: SL05 Remaining Liability Scenarios <br />#1) Remaining reclamation liability costs if water treatment facilities remain <br />Goal-oc-r~ <br />task cost <br />8 Seal 2 piezometers: D 1-A 8 D 2-A $4,212.50 <br />11c re-seed disturbance areas adjacent to flume removal $257.75 <br />12a mobilzationldemobilzation of equipment $564.50 <br />15 remove signs & markers $152.25 <br /> Indirect costs O& P $919.00 <br /> Project management $305.00 <br /> $6,411.00 <br />#2) Remain ing reclamation Liability costs if Long Pond, Pond 9, T-1 & T-2, and mine water conveyance <br /> system is removed. COaS'-OC~L <br />task cost <br />8 Seal 2 piezometers: D 1-A 8 D 2-A $4,212.50 <br />11c re-seed disturbance areas adjacent to Flume removal $257.75 <br />12b mobilzation/demobilzation of equipment $1,072.00 <br />15 remove signs & markers $152.25 <br />4 grade out long pond $184.00 <br />3 grade out T-1 & T-2 $491.00 <br />9 Grade out P-9 (0.4 acres) $835.00 <br />10 Remove manhole & seal pipe (0.3 acres) $113.00 <br /> (2001 R.S. Means site Work p. 37 8750010) <br />13 Remove 1l2 culvert & piping from Mine 1 portal to Long pond $2,480.00 500 ft.long <br /> includes piping from T-2 to P9, P9 to creek (2001 R.S. Means site Work p. 38 8753200) <br />20 Seedlmulch/fertilize areas disturbed by tmt.system $2,163.00 <br /> Indirect O & P $2,051.00 <br /> Project Management $701.00 <br /> $14,712.50 <br />#3) Remain ing reclamation Liability costs if Long Pond, and mine water conveya nce system is removed. <br /> (Pond 9 Remains) CpdS -00~ <br />task cost <br />8 Seal 2 piezometers: D 1-A & D 2-A $4,212.50 <br />11c re-seed disturbance areas adjacent to flume removal $257.75 <br />12b mobilzation/demobilzation of equipment $1,072.00 <br />15 remove signs & markers $152.25 <br />4 grade out long pond $184.00 <br />3 grade out T-1 8 T-2 $491.00 <br />10 Remove manhole & seal pipe (0.3 acres) $113.00 <br />(2001 R.S. Means site Work p. 37 8750010) <br />13 Remove 1/2 culvert & piping from Mine 1 portal to Long pond $1,984.00 400 ft.long <br />includes piping from T-2 to P9, P9 to creek (2001 R.S. Means site Work p. 38 8753200) <br />20 Seedlmulchlfertilize areas disturbed by tmt.system $1,654.00 <br />Indirect O & P $1,701.00 <br />Project Management $591.00 <br />$12,412.50 <br />