Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO: BYRON WALKER <br />FROM: JANET t31 ~ 5 <br />SUBJECT: NOR'PH'CI-IOMPSO FISK, 57.05 RECI.A~LV77pN IJANII,I'lY SCENARIOS <br />DATE: 12/18/2002 <br />CC: DAN HERNANDE% <br />As asked, I have reworked the remaining reclamation liability costs at North Thompson Creek Mine using <br />three different scenarios. The first scenario includes costs for reclaiming the 2 piezometers, seeding failure <br />at the disturbances adjacent to the flume removal sites, removing signs & markers, and mob/demob form <br />Glenwood Springs. The total reclamation liability for scenario #1 is $6,411. <br />Scenario #2 includes all the Scenario #1 costs, but also includes reclamation costs associated with <br />removing permanent water treatment ponds, including the Long pond, T-1, T-2, piping from Portal 1 to <br />Long pond, sealing pipe & reclaiming manhole south of Portal 3, Removal of P-9, seeding areas disturbed <br />by water treatment system and P-9. The total liability costs for Scenario #2 is $14,712.50. <br />Scenario #3 includes all those items noted in Scenario #2, with the exception of the removal of P-9 and the <br />piping from P-9 to North Thompson Creek. The remaining reclamation liability associated with Scenario <br />#3 is $12,412.50 <br />C:/jhb/Team/North Thompson Creek/SLOS/3 liability scenarios.doc <br />