Laserfiche WebLink
Replace Overburden from 20,OOO.OOcyd $0.40 /cyd $8,000 0.50 <br />Mining Area 1 into Mining <br />Area I <br />Install Shelf Wetland for 20.OOhrs $97.00 /hr $1,940 0.10 <br />Mining Area 1 with D9 <br />Disc Ali Disturbed Areas of 6.00 $65.00 !acre $390 0.10 <br />Mining Area 1 <br />Replace Topsoil of Mining 6,000.00 cyd $0.40 /cyd $2,400 1.00 <br />Area 1 <br />Seed Mining Area 1 ofScott 4.OOacres $800.00 /acre $3,200 0.25 <br />Expansion Using Dry <br />Rangeland Mix <br />Seed Mining Areal Shelf and 1.89 acres $1,000.00 /acre $1,890 0.25 <br />Finge Wetlands <br />Dewater Chambers Pit 1.00 $10,000.00 $10,000 1.00 <br />Import Fiil from OtTsite to 36,OOO.OOcyd $1.50 {cyd $Sd,000 0.50 <br />Backfill Highwalls in <br />Chambers Pit <br />Back Fill Slopes of Chambers 100.00 hrs $97.00 /hr $9,700 0.25 <br />Pit Using D9 <br />Spread 9" of Topsoil over 50.00 hrs $97.00 /hr $4,850 0.10 <br />disturbed Area Using D9 <br />Disc All Chambers Areas 25.00 acres $65.00 /acre $1,625 0.25 <br />above water line <br />Seed Surrounding Area of 24.30 acres $800.00 facre 519,440 0.25 <br />Chambers Pit with Dry <br />Rangeland Mix <br />Seed Wetland Fringe of 1.30 acres $1,000.00 /acre $1,300 0.25 <br />Chambers Area <br />Remove Water Control 1.00 $3,000.00 $3,000 0.25 <br />Structures(Ditchs, Berms, <br />Ponds, Etc.) <br />Total $141,735 6.55 <br />DMG Cost: 2l% of the Direct Costs 529,764 <br />Total Bond Amount $171,499 <br />4/26/04 Page L-2 <br />