Laserfiche WebLink
<br /> <br />Mr. David Berry, CMLRD <br />April 12, 1990 - page 2 <br />r <br />~ivision Concern 5). Stripped topsoil wilt. either be added to <br />the existing (1989 construction) stockpile immediately west of <br />East Buzzard pond ~1, to the proposed (1990) stockpile northwest <br />of East Buzzard pond (!1, or the topsoil stockpile immediately <br />south of the proposed tub pad construction s.rea of alternative H <br />(see map 5-1-1989 Annual Report). If topsoil is redistributed it <br />would be within our proposed 1990 topsoil replacement area for <br />Colt pit (see map M10-D sheet 2 of 4). <br />/Division Concern 6). ThC map 5-1 (Topsoil stockpile locations) <br />will be updated to show the small topsoil stockpile described <br />within TR-49. Concerning your comment that all topsoil piles be <br />recorded on Map 5-1 should specify all topsoil piles constructed <br />in 1989 and those proposed for construction in 1990 be recorded. <br />Bection 4.9.2 of Trappers permit application requires that the <br />Division be provided a map illustrating pr©posed topsoil stock- <br />pile locations for the upcoming year and the actual locations of <br />stockpiles constructed the previous year. <br />Division Concern 7). During final reclamation pad concrete will <br />be handled as a non-petroleum ~raste and disposed of in the pits <br />(permit section 4.3.2.2). Peamit paao 4-20 will be updated to <br />.include concrete as a non-petrc'.c~ut^ vast~© y°raduct. <br />Division Concern 8). I loop'. fo~°~.~ars to our upcoming midterm <br />review. <br />Division Concern 9) . Ta revised, pagr. explaiasi.nq the dragline pad <br />details will be incorporated into tL~r; permi.i: facilities section <br />3.8.1. <br />Aaulroad Construction <br />Division Concern 1) . Trapper c~~a.lz. sv±? miu 4 revised haulroad map <br />showing the road construction in accordance c:ith alternative B as <br />soon as possible. <br />Division Concern 2). Strippea topsoil will be stored or redis- <br />tributed as stated in the previous topsoi'. discussion dealing <br />with dragline pad construction. <br />Division Concern 3). Table 4.8.1 10$sulroad Culvert Sizing" will <br />be updated to include culvert BC-5 as soon as possible. <br />Division Concern 4). Bonding - to be discussed during midterm <br />review. <br />