Laserfiche WebLink
<br />5. Because manure and strew <br />fertilizer, please specify the <br />used to prevent infestation of <br />methods are proposed please <br />application rate. <br /> <br />are to be used as m~ <br />weed control methods tha{ <br />undesirable species. If <br />provide the herbicide ~ <br />lch and <br />will be <br />chemical <br />lame and <br />6. Please provide a contingency plan, should the pond pro~e to not <br />hold water. <br />7. Your application states that water rights of 4.75 acre feet are <br />available to fill and maintain the pond. Please clarify to what <br />time frame this amount applies (per day, week, month etc. . <br />8. The application does not specify how the operation of he pond <br />inlet and outlet will work. please clarify. If the pond d scherge <br />is to a different location than the existing irrigation di charge, <br />please provide evidence that the relocation of this disc arge is <br />not detrimental and is acceptable to any adjacent or down radient <br />landowners who mey be affected. <br />9. The map provided with the revision shows two diffe ent gas <br />company pipelines within 50 feet of the mine site affect d area. <br />The map also indicates that the pond outlet will cross on of the <br />gas lines. Weaselskin should notify the two gas companie of the <br />revised reclamation plans for the mine site and address any of <br />their concerns relating to the revise plans. <br />10. I have photocopied the map you provided and revised it so that <br />it contains all required information and is in a form tha can be <br />easily revised end reproduced. I am enclosing some copies or your <br />use. The contours were revised as you requested. I use a 2:1 <br />slope from 10 feet below waterline to the pit floor on t e south <br />and southeast slopes also. This provides for maximum gravel <br />extraction if you should commit to mining at the final pproved <br />slope grades. If this is incorrect, please revise he map <br />accordingly. <br />11. Please use one of the blank maps to illustrate your roposed <br />mining plan. Include and label all stockpiles and struct res, to <br />scale. The mine plan map should show how mining will progr ss from <br />the current pit configuration. <br />12. Please be aware that the change in water use may requi a that <br />the State Engineer's Office or the ditch company, or b th, be <br />notified. Please provide any documentation that address s this <br />concern. <br />