My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96188
DRMS
>
Back File Migration
>
Revision
>
REV96188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:57 AM
Creation date
11/21/2007 11:56:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
11/19/2002
Doc Name
Objection Letters & Request for Conference
From
Paula Coulter
To
DMG
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 15, 2002 <br />concerning the adjoining ditch and the sbpe/grede from the Borrows Area and <br />the drainage off the Pile to Pond 4. <br />Pond 3 <br />There is no reference to Pond 3 in your handout at the Inspection <br />The Pond 3 area has now become more than 5 feet lower than its original natural <br />slope. As you mentioned, retumirrg areas to their °natual slope is part of the <br />requirements to be fulfilled by the reclamation process. The Pond 3 area has a <br />tremendous amount of disturbance and no apparent soil reserves to return it to its <br />natural form. Tree's that are left intact remain on mounds as much as 5 feet above <br />excavation levels. Is it your under~andfng that reclamation will fill in the area so that <br />the trees are once again at their natural levels or are they to remain as °huerfanos° left <br />in a most unnatural state. <br />• We request your inspection report relating to Pond 3 and your requests of EFCI to <br />meat reclamation requirements in this area. <br />Magpie Creek Permanent Diversion <br />The original flow of the reek ran directly through the portal areas and central mining <br />operations. <br />• Are you rasponsibry satisfied that the significent realignment of Magpie <br />Creek will function as designed and that the vast, unstable reclamation <br />of the Portal Area will rrot be adversary affected from potential runoff <br />a-rtl flooding? <br />9. Section 3.03 Release of Pertortnance Bonds <br />303.2 informal Conference on Objections to Requested Release and Decision by the <br />Division <br />1 am requesting an infommal conference pursuant to Section 3032 (4) <br />Intortnal Conference on Objections to Requested Release. <br />I am requesting written notification on your proposed decision to <br />release w not release all w part of the performance bond, together <br />with written reasons for such proposed decision pursuant to Section <br />-303.2 (5j. - - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.