My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96134
DRMS
>
Back File Migration
>
Revision
>
REV96134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:55 AM
Creation date
11/21/2007 11:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999021
IBM Index Class Name
Revision
Doc Name
TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION OF STEGNER FARMS PIT SLURRY WALL LARIMER CNTY COLO
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION t -GENERAL REQUII2EMENTS <br />SECTION 01160 -SITE CONDITIONS <br />PART 1-SITE INVESTIGATIONS AND REPRESENTATION <br />1.01 GENERAL <br />The Contractor acknowledges [hat he has satisfied himself as to the nature and location of the work, the <br />general and local conditions, particularly those bearing upon access to the site; handling, storage, and <br />disposal of materials; availability of water, electricity, and roads; uncertainties of weather, river stages, or <br />similar physical conditions a[ the site; the conformation and conditions of the ground; the equipment and <br />facilities needed preliminary to and during the execution of the work; and all other matters which can in any <br />way affect the work. <br />1.02 SITE CONDITIONS <br />The Contractor further acknowledges that he has satisfied himself as to the character, quality and quantity <br />of surface and subsurface materials to be encountered from his inspection of the site and from reviewing <br />any available records of exploratory work furnished by the Owner or included in these Documenu. Failure <br />by the Convactor to acquaint himself with the physical conditions of the site and all the available <br />information will not relieve him from responsibility for properly estimating the difficulty or cost of <br />successfully performing the work. <br />I.03 WARRANTEE <br />The Contractor warranu that as a result of his examination and investigation of all the aforesaid data chat he <br />can perform the work in a good and workmanlike manner. <br />PART 2 - RVFORMATION ON SITE CONDITIONS <br />2.01 AVAII,ABILITY <br />Any information obtained by the Engineer regarding site conditions, subsurface information, groundwater <br />elevations, existing construction of site facilities, and similar data will be available for inspection, as <br />applicable, at the office of [he Engineer upon request. Such information is offered as supplementary <br />information only. The Engineer does not assume responsibility for the completeness or interpretation of <br />such supplementary information. <br />A. Differing Subsurface Conditions <br />In the even[ that the subsurface or latent physical conditions are found materially <br />different from those indicated in these Documenu, and differing materially from those <br />ordinarily encountered and generally recognized as inherent in the character of work <br />covered in the Plans and Specifications, the Contractor shall promptly, and before such <br />conditions are disturbed, notify the Engineer in writing of such changed conditions. <br />2. The Engineer will investigate such conditions promptly and following this investigation, <br />the Contractor shall proceed with the work, unless otherwise instructed by the Engineer. <br />B. Underground Utilities <br />01/99 Section OI 160 - Page l of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.