Laserfiche WebLink
<br />V[. EXHIBIT F -RECLAMATION PLAN MAP <br />Exhibit F -Reclamation Plan Map, is included as Figure F-l. The purpose of the map is to indicate the <br />expected physical appearance of and portray the proposed final land use for the affected land. The map shows <br />the proposed final reclamation scenario in plan view for final buildout through Phase PJ mining for the South <br />Quarry as described in detail in the previous exhibit. The proposed reclamation is also shown on the phased <br />nuning plan figures referenced in Exhibit D as progressively expanded areas of "minor disturbance" where <br />major or moderate disturbance was shown in preceding figures and that represent reclamation that will occur <br />concurrent with mining. The proposed permanent reservoir site in the North Quarry is shown based on the <br />approximate pool elevation anticipated at this time. <br />ii:WPOIFLTSLtl10PU0MEXTUA¢NDOf.T%T Vt - t <br />