Laserfiche WebLink
~; <br />® C. Compacting of piles <br />Method Sheepsfoot compactor(self pro elled) wheeled (trucks, etc.) <br />To what specification? ~ max. dry ensity per ASTM method D-698 <br />(Standard Proctor Densi y <br />D. Enclosures (describe if complete or partial, type of material, etc.) <br />None Planned <br />Subsoil, topsoil will be placed upon completion of <br />each phase of construction as required bX CMLRD to <br />® E. Covers (describe) minimize area of refuse exQosed at one r,ma_ There <br />are 5 phases of pile construction. <br />* © F. Bevegetate by seeding with or without mulch (circle appropriate <br />items). Types of vegetation Western Wheatgrass, Kentucky Bluegrass, <br />Riparian Wheatgrass Slender Wheatgrass, Mountain Bromegrass, Lewis <br />G. Hind breaks Flax, While Yarrows, Rocky Mountain Penstemon Shrubs: <br />^ None Planned Gambel's Oak, Black Chokecherry, <br />1. Type Douglas Rabbitbrush, Serviceberry, <br />Wood s Rose <br />^ a. Solid: Material (i.e., brick, cement, wood) <br />b. Mesh wind screens (state mesh size) <br />^ c. Snow fence or other fence (specify) <br />^ d. Berms (describe) <br />p e. Vegetation (describe type 6 spacing of trees or <br />shrubs) <br />f. Other (desczi <br />2. Description: if claiming wind breaks as a control methodology <br />you must specify height, length and location of piles and wind <br />breaks and provide a map indicating location of piles, wind <br />breaks, and prevailing winds. <br />® R. Other strategies (describe such as pile alignment, upwind facing <br />slope, loadout on downwind side, minimize traffic on and around pile, <br />etc.) Pile will be constructed in 5 phases and reclamation will take <br />place upon a comp etion o eac p ase to minimize surface area of <br />_ pi~xposed. evegetation will take p ace within 12-mos. of <br />~I. No Control completion of topsoiling and subsoiling. <br />N/A <br />List all other stockpiles and/or disposal areas and describe location, type of <br />material, size and control methodology These are all associated with the lower <br />refuse pile 1) Topsoil stockpiles approx. emporary seeding <br />~~ ~unsoil stocxAiles 44,21b7 cs,temporary seeaing rvote: '1'opsoi. <br />su so~iTstoTpiles wi~be i_n_varying locations during approx. _1.5__y~ <br />ac i~ ve l~~refuse pile. <br />and <br />Page 2 <br />