My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96008
DRMS
>
Back File Migration
>
Revision
>
REV96008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:50 AM
Creation date
11/21/2007 11:54:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Name
FUGITIVE EMISSIONS CONTROL PLAN FOR MATERIALS STORAGE & HANDLING MINING & ASSOCIATED ACTIVITIES
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br />COLORADO DEPARTMENT OF HEALTH <br />Air Pollution Control Division <br />~~~ I~~I~~I~~~~~~'~~ <br />sss <br />Permit S /~2 G u ~3~. 7 <br />(to be filled in by APCD) <br />FQGITZVE EMISSIONS CONTROL PLAN FOR <br />MATERIALS STORAGE AND HANDLING, MINING AND <br />ASSOCIATED ACTIVITIES <br />The Colorado Air Quality Control Commission's Regulation No. 1 requires <br />that a fugitive emissions control plan be submitted by applicants vhose <br />source/activity results in fugitive particulate emissions. The control plan <br />must enable the source to minimize fugitive emissions to a level that is <br />technologically feasible and economically reasonable. If the control plan is <br />not adequate in minimizing emissions a revised control plan will be required <br />unless it is determined that no technologically feasible and economically <br />reasonable abatement measures exist. The control plan (if acceptable to the <br />Division) will be used for enforcement purposes on the source(s). <br />Please check the control measures which you propose for your activity. A <br />separate sheet may be attached eaplaiaing your specific control measures or <br />activities if they differ from those listed in this form or if more space is <br />needed. The Division will contact you if it feels that additional control <br />measures are needed. The control measures you and the Division agree to be <br />applied will be enforced. <br />Those controls likely to be required by the Division are indicated with an <br />* (minimal controls). <br />I. Control of Storage of materials and/or tailings disposal describe <br />source(s) Coal refuse material from underground mining operations <br />* ® A. Watering Refuse Pile <br />XQ 1. Typical watering frequency 1-2 times/day times/week, or <br />continuous sprinkler. W1 en hauling material on pile - <br />only water active working areas. <br />Q 2. Maintain 7-10 S surface moisture content of pile (specify <br />percentage) on active working areas. <br />Is the control measure(s) checked above practSced oa weekend and <br />holidays? ^ Yes ® No Unless hauling is occurring <br />B. Application of chemical stabilizer <br />Not Planned <br />1. Frequency of application <br />2. Type of stabilizer (brand name or chemical composition) <br />Will the stabilizer be applied according to manufacturers' <br />specifications? Yes No <br />Describe method, dilution and rate of application <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.