Laserfiche WebLink
AUG-29-2003 FRI 09 04 All B B EXCAVATING <br />FAR N0. 9709262344 <br />d. "Year" shall mean the period beginning July 1 and ending the <br />following June 30. <br />e. "Operating Policy" shall mean the operating policy for <br />Green Mountain Reservoir as published in the Federal Register en <br />December 22, 1983, as amended September 3, 1987, as published in the <br />fe 'ster on September 11, 1987. <br />f. "Reservoir" shall mean the dam, reservoir, and related <br />facilities known as "Green Mountain keservoir" as presently constructed and <br />operated on the Blue River, a tributary of the Colorado River, in north - <br />central Colorado, as a feature of the CBT Project, <br />g. "Replacement pool" shall mean the 52,000 acre-feet of water <br />available under S. Doc. 80 annually to provide replacement water for <br />western Colorado when water is diverted out of priority to the <br />Eastern Stope through the C-BT Project, <br />h. "Power pool" shall mean the Reservoir's remaining capacity of <br />approximately 100,000 acre-feet, including the 6,316 acre foot refill <br />right, which to the extent feasible will be released through the <br />powerplant, and following release will be available either directly or by <br />exchange for other beneficial uses in western Colorado. <br />P, 07 <br />4 <br />