My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-12_REVISION - M1986104
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986104
>
2003-09-12_REVISION - M1986104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:58:22 PM
Creation date
11/21/2007 11:53:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986104
IBM Index Class Name
REVISION
Doc Date
9/12/2003
Doc Name
Preliminary Adequacy Review
From
Greg Lewicki
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG-29-2003 FRI 09;07 AM B B EXCAVATING <br />PAX N0. 9709262344 <br />studies prove to be incorrect and revised hydrology studies change the <br />marketable yield, the United States may either increase or decrease the <br />volume of future water sates. At any time the marketable yield is <br />determined to be less than the total amount of water under contract, any <br />resulting shortages shall be apportioned pursuant to Article 7. <br />WATER SERVICES CHAR E5 <br />p. a. In accordance with paragraph 5 of the Operating Policy, the <br />United States will charge its Contractors differential Yates for irriga- <br />tion, municipal/domestic, and industrial water service. These rates <br />include an appropriate share of the Reservoir's actual annual OMSR costs. <br />The rates shall be adjustable by the United States to cover OM&R costs if <br />such costs exceed the rates set forth herein. <br />b. The charge for irrigation water service will be an annual <br />charge of E6 per acre-foot for the amount of water contracted for herein, <br />and which the United States is capable of delivering to the Contractor. <br />Payment of this charge shall be due on July 1 for water to be delivered <br />during the succeeding year. No water shall be delivered prior to paymettt. <br />Whether or not the Contractor requests or takes delivery pursuant to <br />Article 5, the Contractor is required to pay annually the charge far all <br />of the irrigation water contracted for herein; Provided, That the <br />United States is Capable of delivering said water. <br />P. 12 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.