My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-07-13_REVISION - M2000016 (42)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-07-13_REVISION - M2000016 (42)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:58:21 PM
Creation date
11/21/2007 11:52:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
REVISION
Doc Date
7/13/2005
Doc Name
combined south platte river substiute supply plan
From
applegate group
To
dmg
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Joanna Williams <br />RE: Combined South Platte SSP Renewal <br />Apri128, 2005 <br />Page 4 oj6 <br />Lined storage is planned after reclamation for these four sites. Any required replacements for lagged <br />depletions caused when dewatering ceases will be made by the applicant. The timing of any depletion to <br />the river as a result of the dewatering operation will be estimated using Glover techniques and <br />incorporated into the final water balance. <br />SURROUNDING WATER RIGHTS <br />The following table lists the gravel pit well permits for each of the active sites. No new well permits or <br />600 foot spacing evaluations will be required. <br />Site Name Well Permit # <br />Howe Pit 55604-F <br />Tanabe Pit 54162-F <br />Dunes Develo ment 54177-F <br />Mann Lakes 56354-F <br />Ft. Lu ton Pit SSS77-F <br />Riverbend O eration New Permit re uired <br />Sta ecoach Sto Pro e New ermit re uired <br />The Riverbend Operation and Stagecoach Stop Property will be required to acquire new well permits <br />prior to the start of mining operations at either site. <br />LONG-TERM AUGMENTATION <br />The following table lists the current bond amounts for the seven mining sites included in this plan. [n the <br />unlikely event Lafarge would leave one of these sites, the bond amounts could be used for either <br />completion of a reservoir liner or backfilling above the groundwater table. <br />Lafarge will maintain a substitute supply plan for each site until the lined storage is constructed and <br />approved by the SEO. After completion of the lined storage at the site, there will be no long-term <br />evaporative depletions requiring augmentation. <br />Site Name Bond Amount <br />Howe Pit $328,800 <br />Tanabe Pit $1,105,900 <br />Dunes Develo ment $719,450 <br />Mann Lakes $0 <br />Ft. Lu ton Pit $56,000 <br />Riverbend O eration $743,000 <br />Sta ecoach Sto Pro e $802,300 <br />C:IDocuments and SettingslDonnaJTaylorlLaca[SettingslTemporary /nternet FilesIOLKBIttr Lafarge SP Combined SSP l2 28 <br />04.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.