My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95789
DRMS
>
Back File Migration
>
Revision
>
REV95789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:42 AM
Creation date
11/21/2007 11:52:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
Revision
Doc Date
11/1/1993
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE ~ COLOI~DO <br />COLORADO DEPARTMENT OF HEALTH <br />AIR POLLUTION CONTROL DIVISION <br />TELEPHONE: (303) 331-8576 <br />EMI~SI®fV P~~lV~~T <br />PERMIT N0: 92LP342P-3 <br />DATE ISSUED: July 30, 1992 <br />op ~~ <br />~0( ~~ <br />:\~\"• <br />. ~s <br />INITIAL APPROVAL <br />ISSUED TO: GOSNEY APJD SONS, INC. <br />THE SOURCE TO WHICFI THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Portable cr•,ncrete batch plant initially located at 6699 County Road 521, Bayfield, LaPlata <br />County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES TILE FOLLOWING: <br />McNeilus Truck and Manufacturing concrote batch plant model MTM, serial number 2250, <br />venting to baghouse. Cement storage silo venting to baghouse. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR QUALITY CONTROL ACT C.R.S. (25-7-101 <br />e se 1. TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE REVERSE SIDE OF TIftS <br />DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />Visible emissions shall not exceed twenty percent 120%1 opacity. <br />flte permit number shall be marked on the subject equipment for ease of identification. <br />Construction of this source must commenca within 1 B months of initial approval permit issuance <br />or within 18 months of the start-up date stated in the application. If commencement does not <br />occur within the stated time the permit will expiro on JantlarV 30. 1994 <br />(See General Condition No. 6., Item 1 on the reverse side of the first page of this permit.) <br />9900/2 73/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.