My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95789
DRMS
>
Back File Migration
>
Revision
>
REV95789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:42 AM
Creation date
11/21/2007 11:52:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
Revision
Doc Date
11/1/1993
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit G - Water Information <br />The operation is expected to have minimal impact on both <br />surface and groundwater systems beyond what historically exists <br />at the site. The operations will create a rangeland/ recreation <br />area and possibly residential sites upon final reclamation. <br />As noted in Exhibit D, the site has been mined intermittenly <br />since about the 1940's; the depth of the workings have been <br />relatively shallow. <br />The elevation of the water table fluctuates seasonally. <br />According to the previous landowner, the elevation of the water <br />generally reaches its lowest point during the months of February, <br />March, April and May, and to its maximum rise-- to approximately <br />± four feet below the ground surface -- during the summer months. <br />The maximum rise in the elevation of the groundwater appears <br />to follow spring runoff and the irrigation of surrounding pasture <br />lands. <br />It is planned that the pit will be mined primarily during <br />the months of March through September, with some year round <br />work and that the pit will be wet mined when possible. Depending <br />on the maximum depth to be ultimately mined ( anticipated to <br />be about ± 12 feet ) water may be encountered. If water is <br />encountered, the proper permits will be applied for and plans <br />provided for the final useage of the water. <br />An irrigation ditch was shown to cross the eastern portion <br />of the original mining area of the gravel pit. As shown before, <br />the ditch is no longer within the permitted area. <br />There are some probable wetlands located near the gravel <br />pit operations. These areas have been reviewed by the Army Corps <br />of Enqineers and it was determined that the areas were <br />non-jurisdictional due to the fact that mining will remain out <br />of the areas in question by a distance of at least 50'. <br />A copy of their letter is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.