Laserfiche WebLink
<br />TASK COST <br />Minor Grading 60 hrs. @ 5140.00 S E,a00.00 <br />Site Cleanup S 1,500.00 <br />Topsoil Distribution <br />9,500 cu. yd. @ 51.75 516,625.00 <br />Seed and Seeding <br />27 acres @ 5350.00 5 9,450.00 <br />Fertilize <br />27 acres @ 5100.00 S 2,700.00 <br />Mulch <br />27 acres @ 5250.00 5 6,?50.00 <br />Purchase 2,700 trees <br />580.00 for 100 trees S 2,160. G0 <br />Fertilize 2,700 trees @ 5.07 S 189.00 <br />Pickup trees S 260.00 <br />Mobilization/Demobilization S 1,000.00 <br />Supervision 120 hrs. @ 530.00 S 3,600.00 <br />ommon costs or hases i 8 ,0 4. 0 <br />Phase II 590 of Total <br />531,000.00 <br />Phase I = 4lo of total + Hydraulics 521,580.00 <br />Phase I Hydraulics <br />rop tructures @ 42,500.00 5 5,000.00 <br />Plunge pools 6 @ 5625.00 S 3,?50.00 <br />Sedimerd; pond Backfill <br />(100x50x7cu.ft.=11,296 cu.yd. @ 51.50 5 2,000.00 <br />Channel Reconstruction 512,200.00 <br />Total Phase I Hydraulics 522,950.00 <br /> <br />Phase I common costs + 521,580.00 <br />ase ota costs <br />OR <br />546,000.00 <br /> <br />