Laserfiche WebLink
<br />Job 1Sub-Total: $568 + $1,703 = $2,271 <br />Sob 2 EARTHWORK: Pit Floor Ripping & Grading <br />Rip-loosen & Rough Grade 1-foot depth of compacted pit floor <br />Equipment: D8N Caterpillaz @ 124 $/Hr @ 546 CY/Hr <br />[9.90-Ac Old Pit F7oorj minus [ 1800-ft x 30-ft = 1.24-Ac backslope area] = 8.66 Ac <br />[17.67-Ac New I'it Floor] minus [2,400-ft x 45 ft = 2.48-Ac backslope] = 15.19 Ac <br />23.85 <br />[23.85 Ac] x [43,560 ~/Ac] x [1 ft] _ [27 ~/Cy] = 38,478 CY <br />546 CY/Hr <br />= 70.47 Hr. <br />x 124 $/Hr <br />= 8,738 <br />Job 2 Sub-Total: = 58,738 <br />Job 3 EARTHWORK: Topsoil Spreading <br />Spread topsoil from topsoil stockpiles over disturbed areas <br />Equipment: Cat 623E/ROPS Wheeled Scraper @ 346 LCY/Hr @ $137.88/Hr <br />[27.75 Ac] x [43,560 ~/Ac ] : [0.75 ft deep] _ [27 ft3/Cy] = 33,578 CY <br />- 346 LCY/Hr <br />= 97.0 Hr <br />x 137.88 $/Hr <br />= 13,374 <br />Sub-Total Job 3 = $13,374 <br />,~~ REVEGETATION SEEDING: (... Per attached landscaping contractor job bid) <br />Brill Seed & Fertilize 27.75 Acres with specified Exh. "E" Recl. Plan seed mix. <br />A) lrwd Fertilizer <br />MaOeriel: _/ / fertilizer @ _ -- Ib/Ac @ _ _ _$/Lb = $ _/Ac <br />Equipment: Traetor-drawn fafp~iur spreader @ _ _ _ Hr/Ac @ _ _$/Hr = $ <br />.L <br />Total Fertilizing Rate: $ /Ac <br />27.75 Ac x $/Ac = $_ _ _ _ Total Fertilizing Cost { A} <br />B) Disc Tilling <br />Equipment: Tractor-drawn disc @ _ _ _ Ac/Hr @ _ _ _ $/Hr $ _ _ _ _/Ac <br />weag~u-~ izc~~~ 25 <br />