My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95537
DRMS
>
Back File Migration
>
Revision
>
REV95537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:32 AM
Creation date
11/21/2007 11:50:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
11/3/2005
Doc Name
Responses to Adequacy Review Comments
From
Seneca Coal Company
To
DMG
Type & Sequence
TR37
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSERTION INSTRUCTIONS <br />SENECA II MINE PERMIT C-80-005 <br />TECHNICAL REVISION (TR-37) <br />MIDTERM REVIEW <br />October 31, 2005 <br />Tab 7, Hydrology, Voi. 3A <br />• TOC -replace existing pages ix - xi <br />Tab 7, Hydrology, Vol. 5 <br />• Appendix 7-G -replace existing appendix slip sheet <br />• Appendix 7-bc.1, As-Built Report Sediment Pond 004 - insert new appendix behind existing <br /> Appendix 7-bc <br />• Appendix 7-be, Design Report Sediment Pond 008 -starting with approximate page 7-be-17, <br /> entitled "As-Built Report Sedimentation Structure 008", remove next 11 pages of text from this <br /> appendix <br />• Appendix 7-bf.l, As-Built Report Sediment Pond 008 -insert this new appendix slip sheet in <br /> front of existing Appendix 7-bf <br />• Appendix 7-bEl, As-Built Report Sediment Pond 008 -insert the repaginated pages 7-bf.l - i <br /> through 7-6£1-10 behind new slip sheet Appendix 7-bf 1 <br />• Appendix 7-b£2, Pond 008 Emergenry Spillway As-Built Report -insert this new appendix slip <br /> sheet behind new Appendix 7-bfl ("As-Built Report Sediment Pond 008' <br />• Appendix 7-bf, Pond 008 Emergency Spillway Report As-Built Report -move this existing <br /> appendix (in its entirety including the Addendum 7-bfA, 7-bfB and 7-bfC) behind the slip sheet <br /> fox Appendix 7-bf.2 <br />• Appendix 7-bf.3, Pond 008 Princpal Spillway Replacement As-Built Report -insert new <br /> appendix behind Appendix 7-bf.2 <br />• Appendix 7-bg.l, As-Built Repot PECOCO Impoundment -insert new appendix behind <br /> existing Appendix 7-bg <br />• Appendix 7-12.1, As-Built Report Drainage Channel SIIPM-I -insert new appendix behind <br /> existing Appendix 7-12. <br />Tab 7, Hydrology, Vol. 6 <br />• List of Exhibits -replace existing list <br />• Exhibit 7-12A, Pond 004 Pxirtdpal Spillway Replacement As-Built -insert new exhibit behind <br />existing Exhibit 7-12 <br />• Exhibit 7-17E, Pond 008 Principal Spillway Replacement As-Built -insert new exhibit behind <br />existing Exhibit 7-17E <br />• Exhibit 7-18A, PECOCO Impoundment As-Built -insert new exhibit behind existing exhibit <br />7-18 <br />• Exhibit 7-23, Channel SIIPM-1 Profile and Sections -insert new exhibit <br />Tab 73, Reclamation Plan, Vol. ]2 <br />• TOC -replace existing page 13-v <br />• Text -replace existing pages 13-45 to 13-48 and 13-51 to 13-54 <br />• Appendix 13-2, Backfill and Grading Schedule -replace existing exhibit <br />
The URL can be used to link to this page
Your browser does not support the video tag.