Phase IVc Summary No. 2 Page 2 043-2170 <br />\J <br />• <br />• <br />and cemented rock-fill portion of the remediation was completed last construction season. Future <br />placement of geogrid will complete remediation of the working. <br />Ames constructed Secondary Underdrain at the west Phase IVb/ IVc tie-in and on the Nc slope on <br />Chicken Hawk Hill. Ames constructed approximately 210 feet of Secondary Underdrain. <br />Ames began constntction of the Phase IVc Leak Detection Trench (LDT) within Phase IVc along the <br />west end of the VLF on Chicken Hawk Hill. Ames constructed approximately 650 feet of LDT. <br />Ames continued production of bentonite-amended SLF at the screen and pug mill plant located above <br />the Ames materials yazd. <br />A map of the area worked during this reporting period is provided in Attachment C. <br />Field Monitorine and Testing Activities <br />Golder observed construction activities associated with Phase IVc earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed placement and compaction of SF in the Phase IVc OSA for subgrade prepazation, <br />lifr thickness, compaction, moisture content, and materials used. The Golder CQA Earthworks <br />Monitor performed visual observations to verify conformance with method specifications. SF <br />placed met the requirements of the project specifications. <br />Golder observed construction of LDT in Phase IVc for trench dimensions, slope, and materials used. <br />Golder observed construction of Secondary Underdrain in Phase IVc for proper trench dimensions, <br />slope, materials, geotextile over-lap, and material thickness. <br />Laboratory Tests <br />Golder obtained QC samples of bentonite-amended soil liner fill (SLF-QC-06, and SLF-QC-07). <br />Laboratory index testing was conducted on samples of bentonite-amended SLF at either the Golder <br />Soils Laboratory in Lakewood, Colorado, or at the field trailer to verify suitability of materials prior <br />to use in the field. A summary of QC laboratory test results for SLF materials conducted after <br />completion of the 2003 construction season is available at the field trailer. <br />Golder obtained one sample of Underdrain Fill (LIFc-O1) for laboratory testing. The sample tested <br />met the requirements of the specifications and results aze presented in Attachment B. <br />Meetines <br />CC&V held Weekly Contractors' meetings on Apri127 and May 4, 2004. Items discussed included <br />Safety, Environmental, Schedule, QC documentation, and CQA. The next weekly meeting will be <br />held on May 11, 2004 at 10:00 AM. <br />rn~rvooz,~d~zs-~YS, zoon e~ Golder Associates lnc. <br />