My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ = __- =Golder <br />ASSOC121teS <br />May 11, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 2: April 25 through May 8, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of April 25 through <br />May 8, 2004. <br />• The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 20° F to 47° F, and highs ranged from 32° F to 73° F. Weather <br />observations were made on fourteen days of this fourteen-day reporting period. <br />Construction Svno~sis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction: Ames conducted Phase Nc construction activities on ten days of this fourteen-day <br />reporting period (Apri127 through May 1, and May 3 through May 7, 2004). <br />Phase Nc <br />Ames resumed contouring and compaction of subgrade in prepazation for soil liner fill (SLF) placement <br />in the Phase Nc Ore Storage Area (OSA). Ames loaded, hauled, and placed structural fill (SF) within <br />the Phase Nc azea footprint during slope re-contouring. <br />Ames removed the 36-inch corrugated steel pipe (CSP) to the outer limits of the Phase Nc Valley <br />Leach Facility (VLF) footprint, and plugged the end of the elbowed 36-inch CSP with approximately 2 <br />cubic yazds of concrete. <br />Ames performed excavation activities at underground working UG-297. This working was previously <br />identified as a deep shaft requiring lateral remediation, as defined in the drawings. The concrete plug <br />• <br />^^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.