My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVc Summary No. 9 Page 2 043-2170 <br />Ames placed and compacted Soil Liner Fill (SLF) material into the Phase IVc OSA, on the north azea of <br />the VLF. SLF material was tested, conditioned, reworked, retested, and maintained prior to SLF <br />surface acceptance. <br />Ames continued production of bentonite-amended SLF at the screen plant and pug mill located above <br />the Ames materials Yazd. Ames also continued limited production of Drain Cover Fill (DCF) material <br />at the screen plant by the secondary crusher. <br />Poly-Flex continued deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />FVc OSA. Geomembrane was installed in the Phase IVc OSA on the south facing slope of Raven Hill <br />downwazd to the Phase IVb/IVc tie-in. Poly-Flex deployed 80-mil single-sided textured LLDPE <br />geomembrane over an area of approximately 235,821 squaze feet in the Phase IVc OSA during this <br />reporting period. Geomembrane panels C-304 through C-362 were deployed, seamed, and tested by <br />Poly-Flex. Destructive fusion seam samples DFc-103 through DFc-128 were mazked during this <br />reporting period without removal or testing. No destructive fusion seam peel and sheaz tests were <br />performed during this reporting period. <br />Ames continued placement and grading of DCF material into the Phase IVc OSA in the western portion <br />of the VLF, Saddle Fill area. Ames placed DCF material onto approved geomembrane panels and High <br />Volume Solution Collection (HVSC) piping per the project plans. <br />A map of the azea worked during this reporting period is provided in Attachment C. <br />• Field Monitorine and Testing Activities <br />Golder observed constrrcton activities associated with Phase Nc earthworks. All constrrction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed excavation and construction of the SU in Phase FJc for trench dimensions, slope, and <br />materials used. <br />Golder observed excavation of the Phase IVc anchor trench for proper location, dimension (2' wide by <br />3' deep) and maintenance prior to deployment. Anchor trench excavation met or exceeded the <br />requirements of the specification. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase Nc OSA for <br />subgrade prepazation, thickness, compaction, moisture-content, and materials used. The Golder CQA <br />earthworks monitor performed twenty-four nucleaz moisture-density tests (SLNc-078 through SLNc- <br />101) and performed ten nucleaz moisture-density retests on SLF that required reworking (SLNc-87a, <br />90a, 91a, 92a, 94a, 96a, 97a, 98a, 99a, and 100a) located within the Phase Nc OSA. The retested SLF <br />met the requirements of the specifications. Field test results are presented in Attachment B. <br />li <br />m,~.~rvoo9 Amy am,y,o iooa.aoc Golder Associates inC. <br />